ADVERTISEMENT

ADVERTISEMENT

MnDOT announces 371 project near Brainerd International Raceway

Project includes reduced conflict intersections and frontage road construction.

HIGHWAY-371-BIR-UPDATE-MNDOT.jpg
MnDOT has announced a plan to reconstruct and improve access to the pictured section of Highway 371 starting June of 2022.
GRAPHIC / Minnesota Department of Transportation

The Minnesota Department of Transportation has announced a project to reconstruct and improve access and safety along a stretch of Highway 371 from the south of Gull Lake Dam Road (Crow Wing County Road 125) to north of Green Gables Road (Crow Wing County Road 126) in June.

The project will install three reduced conflict intersections at Gull Dam Road, Birchdale Road (the BIR main entrance) and Green Gables Road. The project will also resurface work areas with new asphalt including shoulders, turn lanes and adjacent connections. Underground pipes will also be replaced during the project and ditch drainage will be repaired.

The east frontage road will be extended and reconstructed to connect Birchdale Road and East Gull Lake Dam Road.

The west frontage road will be extended and reconstructed to connect Gull Lake Dam Road to north of Susanville Drive Northwest, the old drive-in movie theater entrance.

Visit https://public.govdelivery.com/accounts/MNDOT/subscriber/new?topic_id=MNDOT_815 to sign up for project email updates during roadwork.

What To Read Next
If you have any questions concerning traffic related laws or issues in Minnesota, send your questions to Trp. Jesse Grabow – Minnesota State Patrol at 1000 Highway 10 West, Detroit Lakes, MN 56501-2205.
A look back in history from past issues of the Lake Country Echo weekly newspaper
A look at the past from the pages of the Pine River Journal weekly newspaper
Guest of honor was retiring Scoutmaster Denton Newman Jr.