SUBSCRIBE NOW AND SAVE $1 for 6 months of unlimited news

ADVERTISEMENT

ADVERTISEMENT

MnDOT announces 371 project near Brainerd International Raceway

Project includes reduced conflict intersections and frontage road construction.

HIGHWAY-371-BIR-UPDATE-MNDOT.jpg
MnDOT has announced a plan to reconstruct and improve access to the pictured section of Highway 371 starting June of 2022.
GRAPHIC / Minnesota Department of Transportation

The Minnesota Department of Transportation has announced a project to reconstruct and improve access and safety along a stretch of Highway 371 from the south of Gull Lake Dam Road (Crow Wing County Road 125) to north of Green Gables Road (Crow Wing County Road 126) in June.

The project will install three reduced conflict intersections at Gull Dam Road, Birchdale Road (the BIR main entrance) and Green Gables Road. The project will also resurface work areas with new asphalt including shoulders, turn lanes and adjacent connections. Underground pipes will also be replaced during the project and ditch drainage will be repaired.

The east frontage road will be extended and reconstructed to connect Birchdale Road and East Gull Lake Dam Road.

The west frontage road will be extended and reconstructed to connect Gull Lake Dam Road to north of Susanville Drive Northwest, the old drive-in movie theater entrance.

Visit https://public.govdelivery.com/accounts/MNDOT/subscriber/new?topic_id=MNDOT_815 to sign up for project email updates during roadwork.

What to read next
Show includes visits from famous literary characters.
Winners of several competitions that were part of the annual Hackensack event announced.
All are welcome at centennial celebration.
45 year tradition continues in Staples.